Iron Gate (Serbia-Romania)

Cruise Port schedule, live map, terminals, news

Rating:
Iron Gate cruise port

Region
Europe Rivers

Local Time
2024-11-23 03:26

min: 29 °F (-2 °C) / max: 40 °F (5 °C) 31°F
-0.5°C
Wind: 289°/ 7.3 m/s  Gust: 14.8 m/sWind: 289°/ 7.3 m/s  Gust: 14.8 m/sMod. breeze
7.3 m/s
Min / Max Temperature40 °F / 5 °C
29 °F / -1 °C
  Port Map

Port Iron Gate cruise ship schedule shows timetable calendars of all arrival and departure dates by month. The port's schedule lists all ships (in links) with cruises going to or leaving from Iron Gate, Serbia-Romania. To see the full itineraries (ports of call dates and arrival / departure times) and their lowest rates – just follow the corresponding ship-link.

DayShipArrivalDeparture
1 July, 2025
Tuesday
Mystic Cruises Cruises cruise lineMS nickoVISION
1 July, 2025
Tuesday
Phoenix Reisen Cruises cruise lineMS Adora
2 July, 2025
Wednesday
Viking Cruises Cruises cruise lineViking Kadlin
3 July, 2025
Thursday
Phoenix Reisen Cruises cruise lineMS Antonia
3 July, 2025
Thursday
Phoenix Reisen Cruises cruise lineMS Ariana
3 July, 2025
Thursday
AmaWaterways Cruises cruise lineAmaBella
4 July, 2025
Friday
Mystic Cruises Cruises cruise lineMS Bolero
5 July, 2025
Saturday
Uniworld Cruises cruise lineRiver Duchess
5 July, 2025
Saturday
Viking Cruises Cruises cruise lineViking Ullur
5 July, 2025
Saturday
Luftner-Amadeus River Cruises Cruises cruise lineAmadeus Riva
6 July, 2025
Sunday
Viking Cruises Cruises cruise lineViking Vidar
9 July, 2025
Wednesday
Phoenix Reisen Cruises cruise lineMS Anna Katharina
10 July, 2025
Thursday
Viking Cruises Cruises cruise lineViking Kadlin
10 July, 2025
Thursday
Phoenix Reisen Cruises cruise lineMS Andrea
11 July, 2025
Friday
AmaWaterways Cruises cruise lineAmaVerde
12 July, 2025
Saturday
Viking Cruises Cruises cruise lineViking Vidar
13 July, 2025
Sunday
Viking Cruises Cruises cruise lineViking Ullur
13 July, 2025
Sunday
Uniworld Cruises cruise lineRiver Princess
14 July, 2025
Monday
Phoenix Reisen Cruises cruise lineMS Antonia
16 July, 2025
Wednesday
Viking Cruises Cruises cruise lineViking Rinda
17 July, 2025
Thursday
Phoenix Reisen Cruises cruise lineMS Ariana
17 July, 2025
Thursday
AmaWaterways Cruises cruise lineAmaVerde
18 July, 2025
Friday
Mystic Cruises Cruises cruise lineMS Bolero
19 July, 2025
Saturday
Uniworld Cruises cruise lineRiver Princess
20 July, 2025
Sunday
Viking Cruises Cruises cruise lineViking Lif
24 July, 2025
Thursday
Uniworld Cruises cruise lineSS Beatrice
24 July, 2025
Thursday
Viking Cruises Cruises cruise lineViking Rinda
24 July, 2025
Thursday
Phoenix Reisen Cruises cruise lineMS Amelia
25 July, 2025
Friday
Phoenix Reisen Cruises cruise lineMS Anna Katharina
25 July, 2025
Friday
Phoenix Reisen Cruises cruise lineMS Antonia
25 July, 2025
Friday
AmaWaterways Cruises cruise lineAmaBella
26 July, 2025
Saturday
Viking Cruises Cruises cruise lineViking Lif
27 July, 2025
Sunday
Viking Cruises Cruises cruise lineViking Ullur
29 July, 2025
Tuesday
Luftner-Amadeus River Cruises Cruises cruise lineAmadeus Nova
30 July, 2025
Wednesday
Viking Cruises Cruises cruise lineViking Kadlin
30 July, 2025
Wednesday
Uniworld Cruises cruise lineSS Beatrice
31 July, 2025
Thursday
Phoenix Reisen Cruises cruise lineMS Ariana
31 July, 2025
Thursday
AmaWaterways Cruises cruise lineAmaBella

Iron Gate is the largest dam on Danube River. Located between Romania and Serbia, this is one of Europe's largest Hydroelectric power plants (two stations). 

Iron Gates is a scenic gorge that forms part of the Serbia-Romania border. The waterway is approx 134 km (83 mi) long. The hydroelectric dams are two, the larger being "Iron Gate I" (1971-opened, reservoir capacity 2,1 km3 / 0,5 mi3, surface area 104,4 km2 / 40,3 mi2) and the smaller one is "Iron Gate II" (1984-opened, reservoir capacity 0,6 km3 / 0,14 mi3, surface area 52 km2 / 20 mi2). Iron Gate 1 station's combined annual capacity is 10,89 TWh (5,24 TWh Romanian + 5,65 TWh Serbian). Iron Gate 2 station's combined annual capacity is 2,61 TWh (1,3 TWh Romanian plus 1,31 TWh Serbian).

The Iron Gate Dam's construction started in 1964 as a joint venture between both communist countries - Romania and Yugoslavia (of which Serbia was part until 1992). When completed in 1984, the Dam's both stations had a total of 16 generators producing 432 MW (megawatt) power in total. The generated hydropower back then was equally divided between both countries.

Today, Serbia produces more power annually due to its newer (more efficient) equipment. The Serbian power station has 10 generators (total power output 270 MW) producing approx 1,46 TWh per year. The Romanian power station has 10 generators (total installed capacity 321 MW) producing approx 1,3 TWh (terawatt-hours) per year.

Currently, the Iron Gate powerplant's total generation capacity is 591 MW.

Booking.com