Iron Gate (Serbia-Romania)

Cruise Port schedule, live map, terminals, news

Rating:
Iron Gate cruise port

Region
Europe Rivers

Local Time
2024-11-14 07:22

min: 36 °F (2 °C) / max: 47 °F (9 °C) 37°F
2.8°C
Wind: 294°/ 0.9 m/s  Gust: 0.8 m/sWind: 294°/ 0.9 m/s  Gust: 0.8 m/sVery Light
0.9 m/s
Min / Max Temperature47 °F / 9 °C
36 °F / 3 °C
  Port Map

Port Iron Gate cruise ship schedule shows timetable calendars of all arrival and departure dates by month. The port's schedule lists all ships (in links) with cruises going to or leaving from Iron Gate, Serbia-Romania. To see the full itineraries (ports of call dates and arrival / departure times) and their lowest rates – just follow the corresponding ship-link.

DayShipArrivalDeparture
4 September, 2025
Thursday
Viking Cruises Cruises cruise lineViking Kadlin
5 September, 2025
Friday
Mystic Cruises Cruises cruise lineMS nickoVISION
5 September, 2025
Friday
AmaWaterways Cruises cruise lineAmaVerde
6 September, 2025
Saturday
Viking Cruises Cruises cruise lineViking Lif
6 September, 2025
Saturday
Phoenix Reisen Cruises cruise lineMS Adora
7 September, 2025
Sunday
Viking Cruises Cruises cruise lineViking Ullur
7 September, 2025
Sunday
Phoenix Reisen Cruises cruise lineMS Antonia
8 September, 2025
Monday
Scylla Cruises Cruises cruise lineMS William Wordsworth
9 September, 2025
Tuesday
Mystic Cruises Cruises cruise lineMS nickoVISION
10 September, 2025
Wednesday
Viking Cruises Cruises cruise lineViking Rinda
11 September, 2025
Thursday
Phoenix Reisen Cruises cruise lineMS Anna Katharina
11 September, 2025
Thursday
Phoenix Reisen Cruises cruise lineMS Ariana
11 September, 2025
Thursday
AmaWaterways Cruises cruise lineAmaVerde
13 September, 2025
Saturday
Viking Cruises Cruises cruise lineViking Ullur
14 September, 2025
Sunday
Viking Cruises Cruises cruise lineViking Lofn
15 September, 2025
Monday
Scylla Cruises Cruises cruise lineMS William Wordsworth
18 September, 2025
Thursday
Uniworld Cruises cruise lineSS Beatrice
18 September, 2025
Thursday
Viking Cruises Cruises cruise lineViking Rinda
18 September, 2025
Thursday
Phoenix Reisen Cruises cruise lineMS Antonia
19 September, 2025
Friday
Scylla Cruises Cruises cruise lineMS Emily Bronte
19 September, 2025
Friday
AmaWaterways Cruises cruise lineAmaBella
20 September, 2025
Saturday
Viking Cruises Cruises cruise lineViking Lofn
21 September, 2025
Sunday
Viking Cruises Cruises cruise lineViking Ullur
22 September, 2025
Monday
Luftner-Amadeus River Cruises Cruises cruise lineAmadeus Cara
24 September, 2025
Wednesday
Viking Cruises Cruises cruise lineViking Kadlin
24 September, 2025
Wednesday
Uniworld Cruises cruise lineSS Beatrice
25 September, 2025
Thursday
Phoenix Reisen Cruises cruise lineMS Amelia
25 September, 2025
Thursday
AmaWaterways Cruises cruise lineAmaBella
26 September, 2025
Friday
Scylla Cruises Cruises cruise lineMS Emily Bronte
26 September, 2025
Friday
Mystic Cruises Cruises cruise lineMS Bolero
27 September, 2025
Saturday
Viking Cruises Cruises cruise lineViking Ullur
28 September, 2025
Sunday
Viking Cruises Cruises cruise lineViking Vidar
29 September, 2025
Monday
Phoenix Reisen Cruises cruise lineMS Antonia

Iron Gate is the largest dam on Danube River. Located between Romania and Serbia, this is one of Europe's largest Hydroelectric power plants (two stations). 

Iron Gates is a scenic gorge that forms part of the Serbia-Romania border. The waterway is approx 134 km (83 mi) long. The hydroelectric dams are two, the larger being "Iron Gate I" (1971-opened, reservoir capacity 2,1 km3 / 0,5 mi3, surface area 104,4 km2 / 40,3 mi2) and the smaller one is "Iron Gate II" (1984-opened, reservoir capacity 0,6 km3 / 0,14 mi3, surface area 52 km2 / 20 mi2). Iron Gate 1 station's combined annual capacity is 10,89 TWh (5,24 TWh Romanian + 5,65 TWh Serbian). Iron Gate 2 station's combined annual capacity is 2,61 TWh (1,3 TWh Romanian plus 1,31 TWh Serbian).

The Iron Gate Dam's construction started in 1964 as a joint venture between both communist countries - Romania and Yugoslavia (of which Serbia was part until 1992). When completed in 1984, the Dam's both stations had a total of 16 generators producing 432 MW (megawatt) power in total. The generated hydropower back then was equally divided between both countries.

Today, Serbia produces more power annually due to its newer (more efficient) equipment. The Serbian power station has 10 generators (total power output 270 MW) producing approx 1,46 TWh per year. The Romanian power station has 10 generators (total installed capacity 321 MW) producing approx 1,3 TWh (terawatt-hours) per year.

Currently, the Iron Gate powerplant's total generation capacity is 591 MW.