Iron Gate (Serbia-Romania)

Cruise Port schedule, live map, terminals, news

Rating:
Iron Gate cruise port

Region
Europe Rivers

Local Time
2024-11-15 12:36

min: 30 °F (-1 °C) / max: 47 °F (9 °C) 43°F
6°C
Wind: 307°/ 3.3 m/s  Gust: 4.9 m/sWind: 307°/ 3.3 m/s  Gust: 4.9 m/sLight breeze
3.3 m/s
Min / Max Temperature47 °F / 9 °C
30 °F / -0 °C
  Port Map

Port Iron Gate cruise ship schedule shows timetable calendars of all arrival and departure dates by month. The port's schedule lists all ships (in links) with cruises going to or leaving from Iron Gate, Serbia-Romania. To see the full itineraries (ports of call dates and arrival / departure times) and their lowest rates – just follow the corresponding ship-link.

DayShipArrivalDeparture
3 June, 2026
Wednesday
Viking Cruises Cruises cruise lineViking Kadlin
4 June, 2026
Thursday
Scylla Cruises Cruises cruise lineMS William Wordsworth
4 June, 2026
Thursday
AmaWaterways Cruises cruise lineAmaBella
6 June, 2026
Saturday
Viking Cruises Cruises cruise lineViking Ullur
7 June, 2026
Sunday
Viking Cruises Cruises cruise lineViking Lif
11 June, 2026
Thursday
Viking Cruises Cruises cruise lineViking Kadlin
11 June, 2026
Thursday
Scylla Cruises Cruises cruise lineMS William Wordsworth
12 June, 2026
Friday
AmaWaterways Cruises cruise lineAmaVerde
13 June, 2026
Saturday
Viking Cruises Cruises cruise lineViking Lif
14 June, 2026
Sunday
Viking Cruises Cruises cruise lineViking Ullur
17 June, 2026
Wednesday
Viking Cruises Cruises cruise lineViking Rinda
18 June, 2026
Thursday
AmaWaterways Cruises cruise lineAmaVerde
18 June, 2026
Thursday
AmaWaterways Cruises cruise lineAmaMagna
20 June, 2026
Saturday
Viking Cruises Cruises cruise lineViking Ullur
25 June, 2026
Thursday
Viking Cruises Cruises cruise lineViking Rinda
28 June, 2026
Sunday
Viking Cruises Cruises cruise lineViking Ullur

Iron Gate is the largest dam on Danube River. Located between Romania and Serbia, this is one of Europe's largest Hydroelectric power plants (two stations). 

Iron Gates is a scenic gorge that forms part of the Serbia-Romania border. The waterway is approx 134 km (83 mi) long. The hydroelectric dams are two, the larger being "Iron Gate I" (1971-opened, reservoir capacity 2,1 km3 / 0,5 mi3, surface area 104,4 km2 / 40,3 mi2) and the smaller one is "Iron Gate II" (1984-opened, reservoir capacity 0,6 km3 / 0,14 mi3, surface area 52 km2 / 20 mi2). Iron Gate 1 station's combined annual capacity is 10,89 TWh (5,24 TWh Romanian + 5,65 TWh Serbian). Iron Gate 2 station's combined annual capacity is 2,61 TWh (1,3 TWh Romanian plus 1,31 TWh Serbian).

The Iron Gate Dam's construction started in 1964 as a joint venture between both communist countries - Romania and Yugoslavia (of which Serbia was part until 1992). When completed in 1984, the Dam's both stations had a total of 16 generators producing 432 MW (megawatt) power in total. The generated hydropower back then was equally divided between both countries.

Today, Serbia produces more power annually due to its newer (more efficient) equipment. The Serbian power station has 10 generators (total power output 270 MW) producing approx 1,46 TWh per year. The Romanian power station has 10 generators (total installed capacity 321 MW) producing approx 1,3 TWh (terawatt-hours) per year.

Currently, the Iron Gate powerplant's total generation capacity is 591 MW.

Booking.com