Pocinho (Portugal)

Cruise Port schedule, live map, terminals, news

Rating:
Pocinho cruise port

Region
Europe Rivers

Local Time
2024-10-18 23:27

min: 54 °F (12 °C) / max: 63 °F (18 °C) 56°F
13.6°C
Wind: 226°/ 1.2 m/s  Gust: 1.2 m/sWind: 226°/ 1.2 m/s  Gust: 1.2 m/sVery Light
1.2 m/s
Min / Max Temperature63 °F / 18 °C
54 °F / 13 °C
  Port Map

Port Pocinho cruise ship schedule shows timetable calendars of all arrival and departure dates by month. The port's schedule lists all ships (in links) with cruises going to or leaving from Pocinho, Portugal. To see the full itineraries (ports of call dates and arrival / departure times) and their lowest rates – just follow the corresponding ship-link.

DayShipArrivalDeparture
30 June, 2025
Monday
Mystic Cruises Cruises cruise lineMS Douro Queen20:0001 Jul, 07:00
30 July, 2025
Wednesday
Scylla Cruises Cruises cruise lineMS Andorinha
30 July, 2025
Wednesday
Emerald Cruises Cruises cruise lineEmerald Radiance
1 July, 2025
Tuesday
Uniworld Cruises cruise lineSS Sao Gabriel
1 July, 2025
Tuesday
Uniworld Cruises cruise lineSS Bon Voyage
2 July, 2025
Wednesday
Emerald Cruises Cruises cruise lineEmerald Radiance
5 July, 2025
Saturday
Scenic Cruises Cruises cruise lineScenic Sapphire
5 July, 2025
Saturday
Scenic Cruises Cruises cruise lineScenic Gem
5 July, 2025
Saturday
Scenic Cruises Cruises cruise lineScenic Azure
5 July, 2025
Saturday
Scenic Cruises Cruises cruise lineScenic Diamond
5 July, 2025
Saturday
Avalon Waterways Cruises cruise lineAvalon Alegria
7 July, 2025
Monday
Mystic Cruises Cruises cruise lineMS Douro Queen20:0008 Jul, 07:00
8 July, 2025
Tuesday
Uniworld Cruises cruise lineSS Sao Gabriel
8 July, 2025
Tuesday
Uniworld Cruises cruise lineSS Bon Voyage
9 July, 2025
Wednesday
Emerald Cruises Cruises cruise lineEmerald Radiance
12 July, 2025
Saturday
Scenic Cruises Cruises cruise lineScenic Azure
12 July, 2025
Saturday
Avalon Waterways Cruises cruise lineAvalon Alegria
14 July, 2025
Monday
Mystic Cruises Cruises cruise lineMS Douro Queen20:0015 Jul, 07:00
15 July, 2025
Tuesday
Uniworld Cruises cruise lineSS Sao Gabriel
15 July, 2025
Tuesday
Uniworld Cruises cruise lineSS Bon Voyage
16 July, 2025
Wednesday
Scylla Cruises Cruises cruise lineMS Andorinha
16 July, 2025
Wednesday
Emerald Cruises Cruises cruise lineEmerald Radiance
19 July, 2025
Saturday
Scylla Cruises Cruises cruise lineMS Andorinha
19 July, 2025
Saturday
Scenic Cruises Cruises cruise lineScenic Azure
19 July, 2025
Saturday
Avalon Waterways Cruises cruise lineAvalon Alegria
21 July, 2025
Monday
Mystic Cruises Cruises cruise lineMS Douro Queen20:0022 Jul, 07:00
22 July, 2025
Tuesday
Uniworld Cruises cruise lineSS Sao Gabriel
22 July, 2025
Tuesday
Uniworld Cruises cruise lineSS Bon Voyage
23 July, 2025
Wednesday
Emerald Cruises Cruises cruise lineEmerald Radiance
26 July, 2025
Saturday
Avalon Waterways Cruises cruise lineAvalon Alegria
28 July, 2025
Monday
Mystic Cruises Cruises cruise lineMS Douro Queen20:0029 Jul, 07:00
29 July, 2025
Tuesday
Uniworld Cruises cruise lineSS Sao Gabriel
29 July, 2025
Tuesday
Uniworld Cruises cruise lineSS Bon Voyage
29 July, 2025
Tuesday
Scenic Cruises Cruises cruise lineScenic Sapphire
29 July, 2025
Tuesday
Scenic Cruises Cruises cruise lineScenic Gem
29 July, 2025
Tuesday
Scenic Cruises Cruises cruise lineScenic Diamond
29 July, 2025
Tuesday
Scenic Cruises Cruises cruise lineScenic Azure

Pocinho is a Douro River cruise port and village in Vila Nova de Foz Coa (Guarda, Portugal), and close to Pocinho Dam. Passengers can explore the valley and visit Coa Valley Museum or canoe on Sabor River.

Pocinho railway stationis the eastern terminus of Douro railway line (opened in 1887). Formerly, the railway continued eastwards into Spain. However, it closed in 1988. The narrow gauge railway (Sabor line, length approx 100 km / 60 ml) used to run northeast from Pocinho to Duas Igrejas (close to Miranda do Douro). Sabor line was closed in 1988.

Pocinho cruise terminal

Pocinho Dam (Barragem do Pocinho) is a concrete dam on Douro River, with height 49 m (160 ft) and length 430 m (1410 ft). Dam's construction started in 1974 and was completed in 1982. Dam's water volume is 120,000 m3, with max discharge 15,000 m3. The hydroelectric power plant built on the dam has nominal capacity 186 MW and average generation between 410-534 GWh. On the dam's right side there is a lock that can handle boats (and cruise ships) with max LOA length 83 m (272 ft), max width 11,4 m and max draught 3,8 m.

Booking.com