Riga (Latvia)
Cruise Port schedule, live map, terminals, news
Region
Baltic - Norwegian Fjords - Russia
Local Time
2024-11-10 05:49
6.6°C
2.4 m/s
40 °F / 5 °C
Port Riga cruise ship schedule shows timetable calendars of all arrival and departure dates by month. The port's schedule lists all ships (in links) with cruises going to or leaving from Riga, Latvia. To see the full itineraries (ports of call dates and arrival / departure times) and their lowest rates – just follow the corresponding ship-link.
Day | Ship | Arrival | Departure |
---|---|---|---|
1 August, 2026 Saturday | Sapphire Princess | 08:00 | 16:00 |
5 August, 2026 Wednesday | MSC Poesia | 07:00 | 15:00 |
10 August, 2026 Monday | Norwegian Sun | 09:00 | 17:00 |
11 August, 2026 Tuesday | Sapphire Princess | 08:00 | 16:00 |
16 August, 2026 Sunday | Norwegian Sun | 09:00 | 18:00 |
19 August, 2026 Wednesday | MSC Poesia | 07:00 | 15:00 |
26 August, 2026 Wednesday | AIDAmar | 08:00 | 16:00 |
26 August, 2026 Wednesday | Norwegian Sun | 09:00 | 17:00 |
27 August, 2026 Thursday | Seven Seas Grandeur | 09:00 | 15:00 |
Port Riga is Latvia's principal port, capital and largest city (population around 650,000, metro over 1 million), and also among Northern Europe's major financial and economic centers. The Port is on Daugava River, approx 15 km (10 mi) from the Baltic Sea (Riga Gulf). About half of all Latvian jobs are in Riga. The city generates over 50% of the country's GDP and handles ~50% of all exports. The largest exporters are in the industries of IT technologies and applications, wood products, food and beverage manufacturing, transportation, metallurgy, pharmaceuticals. Annually, RIga is visited by ~2,3 million tourists.
The city is served by Riga Airport, which by annual traffic is currently ranked the Baltic countries' largest (Estonia, Latvia, Lithuania). The airport serves regularly scheduled direct flights to ~80 airports (in 30 countries) and is the principal base for Latvia's three airlines (airBaltic, RAF-Avia, SmartLynx Airlines/fka LatCharter). Seasonal and charter flights link with Israel, Egypt, Bulgaria, Sicily Italy, Greek Isles, Malta, Madeira, Canary Islands, Scotland, Kazakhstan, Georgia, among others.
The historic downtown is listed as a UNESCO Site. Both domestic and foreign tourists are attracted by the active nightlife and diverse cuisine options. Southern Bridge (2008-opened) over Daugava River was the largest construction project in the Baltic states. With building cost EUR 815+ million, the Bridge was constructed specifically to reduce downtown's traffic congestion.
Freeport Riga
Port Riga (locode LVRIX) is among the Baltic Sea's largest cargo ports, handling annually 34+ million tons of cargoes. It also has a potential for future growth via a new port development project on Krievu Sala Island.
The seaport facilitates passenger (ferries and cruise ships via Riga Passenger Terminal) and cargo shipping traffic. Tallink-Silja's ferries connect the city to Stockholm Sweden.
Riga Port City is a harbor (dockland) redevelopment project that started in 2006 (when Tallink started the Riga-Stockholm line). It was developed in two phases - A (design, initial studies, conceptual blueprints, physical masterplan) and B (blueprint, marketing strategy).
Regularly scheduled ferries connect Riga with Stockholm (Sweden). The service (7 weekly crossings, travel time 18 hours) is provided by TALLINK-SILJA LINE. In 2006, Tallink Grupp purchased Attica Group's Baltic services for EUR 310 million, and opened the Riga-Stockholm route. Ferries also interlink Riga with Tallinn (Estonia), Helsinki (Finland), Langnas (Aland Finland)), Visby (Gotland Sweden).
In 2017, the cruise port handled 86 ship calls and nearly 90,000 passengers. In 2018, the Port had scheduled 91 cruise ship calls (including 6 maiden port calls) and handled 75,000+ passengers. Port Riga plans to increase its annual cruise shipping traffic to over 160,000 tourists by year 2030.
In January 2018, Freeport Riga Authority started works on creating the Port's development plan for the period 2020-2030. It includes development trends, infrastructural improvements, development of new logistics routes, sustainable environmental policy. The new plan was scheduled for completion by the end of 2018.
On July 20, 2018, the port received its ever-largest cruise liner - RCI-Royal Caribbean's Serenade of the Seas (length 293 m / 961 ft). The boat moored right into downtown, which became possible after cleaning works (riverbed sediments) conducted in the Approach Channel and the Turning Basin (near Vansu Bridge). Previously, such larger ships were moored at KS Terminal Pier (Krievu Island), where water depth and turning basin's size are proper. After cleaning the sediments, the swinging basin's diameter was extended from 380 to 400 m (1312 ft) which is the max possible in regard to the existing port infrastructure. These works (done by Rohde Nielsen AS) included over 111000 m3 of excavated soil that was used for construction works in KudziÅsala.
In 2018, Port Riga reported around 1/3 increase in timber cargo shipping (~4,4 million tons) handled at 13 different terminals. Most timber products (sawn wood, pulpwood, woodchips) are Latvian export, some are from Belarus. Processing at the timber terminals includes impregnation, fumigation, drying, containerization, storage. The export is mainly to UK, Denmark and Sweden.
For season 2019, the cruise port had scheduled/booked a total of 85 ship berthings.
In 2022 was announced the "Riga RoPax Terminal" project for constructing a new/second passenger terminal serving both cruise vessels and ferries. The project was initially scheduled for completion in 2025. In May 2024, Zaha Hadid Architects won the contract for RIga Ropax Ferry Terminal's design and engineering.
Riga cruise terminal
Port Riga has three cruise ship berths dedicated for passenger ships. Berths MK-3 and MK-4 have total length of 463 m (1519 ft) and capacity to accommodate vessels with LOA length up to 290 m (951 ft). At Berth JPS-1 can dock smaller ships - with max LOA length 110 m (361 ft).
When all three berths are occupied, cruise vessels can dock at Berth JPS-2 (dedicated to ferries), which is adjacent to Berth JPS -1.
The existing infrastructure of port's cruise facilities is insufficient. Riga Passenger Terminal is too small to handle larger (and newbuild) liners. As an alternative was proposed to be built a new terminal at Krievu Island. This location is currently used for handling cruise vessels during peak periods only as it is not suitable due to the long distance from downtown and also its unattractive environment.
(NEW) RIga Ropax Ferry Terminal (cruise and ferry vessels)
In 2022 was announced the "Riga RoPax Terminal" project for constructing a new/second passenger terminal serving both cruise vessels and ferries. The project was initially scheduled for completion in 2025.
In May 2024, Zaha Hadid Architects/ZHA won the contract for the RIga Ropax Ferry Terminal's design and engineering.
Planned for completion in 2028, the project includes the construction of a new passenger and cargo terminal by transforming the existing shipping warehouse (1960s-built) into a 20,000-m2/~215,300-ft2 modern building serving ferry passengers and cruise tourists.
For the project, ZHA subcontracted Sarma Norde Architects, Alps Landscape Architects, and Sweco Finland.
The terminal's design was developed by R-Konsult OU (1996-founded, Tallinn-based architecture firm).
The design includes a modernized building, green spaces (public terraces with panoramic views of Daugava River and the city's skyline, a plaza with an esplanade/riverside walkway), leisure, and commercial facilities (restaurants, cafes, bars, shops). As the old warehouse's frame (made of reinforced concrete) is retained, the building has an orthogonal structure wrapped in external vertical fins (made from recycled bricks) at various angles for maximized shading.
The building's 3-floor-high Hall serve both arriving and departing passengers and features expansive openings allowing natural light into the interior. The top floor is covered with a roof canopy (finished with Latvian pottery/ceramic tiles and solar panels) that extends beyond the building. For the structural elements (large columns lining the ground floor, wooden finishes, ceiling panels) will be used locally sourced timber.
Riga's new passenger terminal is specifically designed to be suitable as a cruise ship homeport (for roundtrip itineraries).
The new passenger terminal has a projected max annual capacity 540 cruise ship visits plus 360 ferry visits and 180 visits from RO-RO ships (vehicle carriers). The facility's annual max passenger capacity is ~800,000 (in the opening year/2028).
Riga Passenger Terminal (ferry and cruise)
The cruise terminal (Riga Passenger Terminal) is located on Daugava River, and next to the ferry berth JPS-2. The building provides all the relevant services for safety and security. The distance between the cruise terminal and downtown is easily walkable (only 0,5 km, approx 10-min walk). At the pier there is a taxi rank. Local transportation services also include buses, trolleys and trams.
- Ferry terminal address is "3a Eksporta Str, Riga, LV-1010"
- The facility is open between 9 am - 6 pm. The building houses waiting hall, luggage room, ATM machines, currency exchange desk, cafe restaurant.
- Car parking (Europark) costs EUR 12 per vehicle per day (24 hours).
The passenger terminal can be reached from downtown via trams (bus lines 5, 7, 6, 9, 11). Kronvalda Bulvaris station is located approx 500 m from the terminal. Tram's second stop (Nacionala) is in downtown.
Riga tours, shore excursions, hotels
City Tours and Shore Excursions
- Town Hall Square: there you will see a replica of the statue of the Patron saint of Riga, Roland, the town hall and the House of Blackheads. The square most beautiful around Christmas.
- Freedom Monument: famous landmark with a lot of symbols. The statue represent a woman who was robbed. She is atop a column and holds high three starts. Originally each star represented a Latvian religion (Lutheran, Catholic and Orthodox). During Soviet time, each time represented a Baltic country and the woman was Mother Russia.
- Central Market: grand market where you can buy almost everything.
- Powder Tower: a relic that remained from the medieval defensive system in Riga. Currently, it is a part of the Military Museum.
- Three Brothers: those are three buildings that date back in the 15, 17, and 18 centuries. They are the oldest stone building in Riga. One of the buildings is the home of the Museum of Architecture.
- St. Peter’s Church: located in the Old Town. The most amazing part is the tower.
- Cruise Industry
AIDA Cruises returns to Riga (Latvia) after 5-year hiatus
This season, AIDA Cruises returns to Riga (Latvia) with 9 scheduled calls across 3 ships, marking the end of a 5-year hiatus. An AIDA spokesperson...
June 27, 2024 - Cruise Industry
Design approved for Riga's new passenger terminal (cruise and ferry)
Zaha Hadid Architects has unveiled their winning design for the Ropax Ferry Terminal in Riga Latvia. The competition aimed to create a new passenger...
May 21, 2024 - Cruise Industry
Viking Line and Gotlandsbolaget launch joint venture: Birka Gotland to debut in Spring 2024
In August 2023, Viking Line and Gotlandsbolaget/Destination Gotland (1998-founded, headquartered in Visby, Gotland Island, Sweden), both...
January 4, 2024 - Cruise Industry
Crystal Cruises' ships Serenity and Symphony in 2025 visit 281 ports/112 countries
Crystal has unveiled its 2025 itineraries for Crystal Serenity and Crystal Symphony, following the brand's acquisition by the A&K Travel Group...
September 14, 2023 - Cruise Industry
Tallink has no plans to restore Latvia-Sweden ferry route Riga-Stockholm
Estonian ferry company Tallink announced that there were no plans to restore ferry services between Riga (Latvia) and Stockholm (Sweden). Katri...
February 15, 2023 - Cruise Industry
Costa Cruises opens bookings for 2024 itineraries in the Mediterranean and Northern Europe
Costa Cruises announced its itineraries for 2024. The newest edition of the Around the World voyage (December 2024) will also be available in the...
February 2, 2023 - Cruise Industry
Port Stockholm (Sweden) receives green light for EU grant funding application
Ports of Stockholm (Sweden) can jointly apply, together with 8 other Baltic Sea ports, for EU grant funding for pilot studies in order to develop the...
January 18, 2023 - Cruise Industry
10-millionth cruise passenger arrives at Port Riga (Latvia)
On Sunday evening, August 7, the 10-millionth cruise passenger arrived at Rīga Free Port (Latvia). It was a woman from Bavaria who sailed with a...
August 10, 2022 - Cruise Industry
Fred. Olsen Cruise Lines welcomes its 3rd ship ms Balmoral back into service
The UK-based Fred Olsen Cruise Lines welcomed its 3rd ship back into service, with the return of ms Balmoral marking the start of a summer season...
May 20, 2022 - Cruise Industry
MS Hamburg is the first cruise ship to arrive at Port Riga (Latvia) in 2022
MS Hamburg arrived at Port Riga (Latvia) on Tuesday, April 12, marking the start of the port's cruise season. The MS Hamburg ship with a capacity of...
April 15, 2022 - show more news